HSD fuel fired horizontal three pass smoke tube wet back boiler

If you run into any problems with the boiler, please contact us directly by email or fill out the online service request.
We will do our best to resolve any problems you might have within 24 hours.

Our Cases Contact Us

TEL:+86 13506151331
E-mail: [email protected]
address:No. 76, Xin Da Road, Zhou tie Town, Yixing, Wuxi, China

zozen boiler
  • Boiler name: HSD fuel fired horizontal three pass smoke tube wet back boiler

  • Boiler Distributor:Boiler body uses the forced circulation in the high temperature area to make sure all heating areas can be cooled down and avoid vaporization

  • Email:[email protected]com

  • Please email or call us for your inquiry

HSD fuel fired horizontal three pass smoke tube wet back boiler

Boiler body uses the forced circulation in the high temperature area to make sure all heating areas can be cooled down and avoid vaporization; The explosion door and flame detector are equipped for safe and reliable operation. Comb plates are used between both sides of boiler and tube bundle to avoid leakage of condensate and gas caused by using refractory concrete as sealing material. Air proof test is done before delivery in the factory to guarantee any gas leakage problem.

Big combustion chamber equipped with Low emission combustion burner effectively reduce the NOx to 30mg/m3. Smoke duct and smoke outlet use internal insulation to reduce operating noise.Combustion chamber uses full membrane water cooling wall structure and pressurized combustion without smoke mixture.

zozen boiler zozen boiler zozen boiler

    DOLE Occupational Safety and Health Standard

    The objective of this Standard is to protect every workingman against the dangers of injury, sickness or death through safe. and healthful working conditions, thereby assuring the conservation of valuable manpower resources and the prevention of loss or damage to lives and properties, consistent with national development goals and with the State's commitment for the total development of every

    Contact us

    Welcome to Petroleum and Natural Gas Regulator

    Where ‘D’ is the outside diameter of the steel pipe. 1.8.4.1 Use of Miter bend shall not be permitted.. 1.8.4.2 The minimum bend radius for hot bends shall be 3D.. 1.8.5 Insulating Joints. 1.8.5.1 Insulating joints shall be provided to electrically isolate the buried pipeline from the above ground pipeline, station piping and shall allow smooth passage of pigs.

    Contact us

LEAVE YOUR MESSAGE !

7*24 hours of counseling service, offering the most effective and fastest service to ensure that
the loss caused by the failure for customers is minimized.

Contact Us