5mw power plant boiler thailand

If you run into any problems with the boiler, please contact us directly by email or fill out the online service request.
We will do our best to resolve any problems you might have within 24 hours.

Our Cases Contact Us

TEL:+86 13506151331
E-mail: [email protected]
address:No. 76, Xin Da Road, Zhou tie Town, Yixing, Wuxi, China

zozen boiler
  • Boiler name: 5mw power plant boiler thailand

  • Boiler Distributor:Boiler body uses the forced circulation in the high temperature area to make sure all heating areas can be cooled down and avoid vaporization

  • Email:[email protected]

  • Please email or call us for your inquiry

5mw power plant boiler thailand

Boiler body uses the forced circulation in the high temperature area to make sure all heating areas can be cooled down and avoid vaporization; The explosion door and flame detector are equipped for safe and reliable operation. Comb plates are used between both sides of boiler and tube bundle to avoid leakage of condensate and gas caused by using refractory concrete as sealing material. Air proof test is done before delivery in the factory to guarantee any gas leakage problem.

Big combustion chamber equipped with Low emission combustion burner effectively reduce the NOx to 30mg/m3. Smoke duct and smoke outlet use internal insulation to reduce operating noise.Combustion chamber uses full membrane water cooling wall structure and pressurized combustion without smoke mixture.

zozen boiler zozen boiler zozen boiler

    Broad Absorption Chiller - ECS Energy Solution Co.,Lt

    Waste Heat recovery from Hot Oil Boiler to Air conditioning. Model : BDH20 x 1sets Function : Chilled Water Supply Cooling capacity : 50 RT x 1 sets

    Contact us

    Orano - Wikiped

    Orano (previously Areva) is a French multinational group specializing in nuclear power and renewable energy headquartered in Paris La D;fense.[4] Areva is majority owned by the French state,[5] through French Alternative Energies and Atomic Energy Commission (54.37%), Banque publique d'investissement (3.32%), and Agence des participations de

    Contact us

    JCM The Joint Crediting Mechanism - Foundati

    Joint Crediting Mechanism (JCM) is a mechanism in which Japan contributes to reduction and absorption of greenhouse gas emissions globally by establishing systems to transfer technologies and implement measures suited to the situation of developing countries.

    Contact us

    Projects: Fichtner Consulting Engineers (India) Privat

    Our Services: Review of As Is Scenario of the power plants with respect water consumption, SOx, NOx, Particulate Matter and Mercury and prepare Feasibility Reports and Detailed Project Reports for each of the above power plants in order to meet the revised MOEF ;CC Norms.

    Contact us

    Energy Venture Capital and Angel Investors Lis

    The number of venture capital firms interested in energy is growing rapidly. This is a list of firms that have invested in energy companies or are taking time to investigate the space.

    Contact us

LEAVE YOUR MESSAGE !

7*24 hours of counseling service, offering the most effective and fastest service to ensure that
the loss caused by the failure for customers is minimized.

Contact Us